Planning the right amperage and cabling for a sub panel used in a basement garage and other locations.
How install sub panel dry wall.
Do this right before you intend to hang the drywall.
4 with help hoist the drywall on the wall and using the drill install five screws in the stud at the center of the drywall panel.
Mount the sub panel with the top of the panel box at 6 above the floor.
This will allow it to adjust to the humidity in a room.
Actual costs will depend on job size conditions and options.
Run the feeder cable from the main panel to the subpanel.
How to plan for a sub panel.
If you are a homeowner and need to learn the skills to do drywall you have found the right video series.
Run a bead of glue down each strapping or joist over which drywall will be placed.
It is recommended when installing drywall to leave a 1 4 gap between the concrete floor and the base of the drywall to avoid moisture contamination.
Join us and learn all things drywall.
Planning for an electric sub panel.
Press the panel in place on the wall.
Identifying panel circuits and connected loads.
Position the piece lift it with a drywall lift and screw it in place.
Tap the entire surface of the panel lightly with a rubber hammer to flatten and set the adhesive.
Typically the face of the panel extends 1 2 in front of the face of the wall studs so the drywall will be flush with the finished wall.
For best results set the paneling in the room for a few days before you install it.
The first step in how to install paneling is to remove all wall plates outlets and any nails in the wall.
You can secure the panel with a small finish nail in each corner if you are using a slow curing adhesive.
With the main panel door open insert the cable and slide it through the knockout opening.
The 4 wire feeder cable should be included with your subpanel and is a large black cable with 4 wires inside of it.
Install drywall to reach the floor and frame outside corners begin the bottom row with a shorter piece so that the seam in the top row will not be directly above the seam in the bottom row.
Screw the panel into the studs using the holes on the sides of the box.
You should place these nails where molding will cover them after the molding is installed.
Gently remove any crown moulding baseboards and trim you plan on using again.
Sub panels are installed and used for several reasons including expanding the circuit.
For a basic project in zip code 47474 with 1 sub panel the cost to install an electrical sub panel starts at 1 279 1 556 per sub panel.
When the small piece is in place install the longer piece.
To estimate costs for your project.
Set project zip code enter the zip code for the location where labor is hired and materials purchased.