You ll want to order metal panels that are an appropriate color and look to complement your.
How do you install metal roofing.
In a standing seam roof long single panels run vertically all the way from the eave to the ridge.
You can learn more about installing eave trim and offset cleats in another one of our metal roofing installation videos.
Measure the length of the roof and the breadth of one side.
Take your first sheet.
Installing your roofing 1.
Before you start to install corrugated metal roofing you need to figure out how much you need.
Install offset cleat install the offset cleat along the eave and then you are ready to install the metal roofing panels.
Remove the old roof.
The edging or eave flashing consists of metal strips that are used to cover the perimeter of.
Corrugated metal roofing generally comes in sheets that are 3x6 feet in size 18 square feet.
Place the first screw.
Without getting up on the roof itself you can get the measurements simply by measuring the length and width of the roof and then multiply these.
By following the 10 simple instructions below you will be able to install a corrugated metal roof on your garage or shed.
The offset cleat allows us to create a true hidden fastener installation.
Always begin working at the point with the longest peak to eave distance.
Install the roofing screws vertically along each rib in the panel.
You will need to order enough metal material to cover the entire roof and this process.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Measure the roof area.
Add the metal panels.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.